CH
(NO) NRR LO 204415 (RU)UAS 6254-21/SIB
SIB n 24
29.03.2021
|
(RU)UAS 5214-18/SIB
SIB d 09 22
|
GIC
(NL)CAT-31072015-SB-003
SIB n 09 22
31.07.2015
|
QGC
(DE)CATS 16042013-SB-002
SIB n 09 22
16.04.2013
|
QGC
(NL)NRKV 2010-0312
SIB n 23
|
CH
(RU)UAS 4915-17/SIB
SIB f 03 22
|
IC
(CZ)CSCH LO 22/16/SIB
SIB d 09 24
|
(RU)UAS 4592-16/SIB
SIB n 24
|
(RU)PK ES-03/20/125 SIB
SIB a 24
|
GICH
(RU)PK ES-11/17/436 SIB
SIB a 23
|
ECH
(RU)PK ES-06/16/205 SIB
SIB n 24
|
GICH
(RU)PK ES-11/14/333/SIB
SIB n 23
|
GICH
(RU)PK ES-03/17/092 SIB
SIB n
|
CH
WCF RU-0204-04/SOZ-SIB-1549-13
SIB n 22
03.04.2013
|
GICH
(RU)PK ES-04/15/081 SIB
SIB n 24
|
(NO) NRR LO 198350 (RU)UAS 5813-20/SIB
SIB ny 24
15.03.2020
|
ECH IC
(RU)ARCCA RX 26841 (LV)CFCA RX 559
SIB ny 24
03.07.2008
|
CH
(RU)IFC 1129/05/SIB
SIB n 24
10.10.2005
|
GRCH & ECH
(RU)IFCE 787/03/SIB
SIB n 24
|
PR CH
(RU)IFCE 895/04/SIB (RU)ARCCA RX 10919
SIB ny 24
|
WCH, QCG, CH
(RU)IFCE 698/2001/SIB (RU)ARCCA RX 15917
SIB ny 24
09.11.2001
|
GIC
(RU)ARCCA RX 13157 (RU)AR SIB/96-21 EXP
SIB ny 23
|
WCH
(RU)ARCCA RX 15319 (RU)IFCE 510/98/SIB
SIB n 22
|
WCF RU-0189-128/02/2017/LI-SIB
SIB n 22
|
(RU)IFCE 1508/08/SIB
SIB ny 22
|
IC
(RU)ARCCA RX 16198 (RU)IFC LO 857/04/SIB
SIB ny 22
|
(RU)RU 013/2005/SIB
SIB ny 22
|
ICH
(RU)IFC 1508/08/SIB
SIB n 09 22
|
(RU)IFC 1034/12/SIB
SIB n 23
|
(ES)ASFE LO 49387
SIB n 09 22
|